2022

Acquisition of SHP Nova Maurício and SHP Glória power plants, which so far had belonged to mining company Vale. With 29.23MW of capacity installed, Nova Maurício is located in the city of Leopoldina, while Glória has 13.8MW of power and is located in Muriaé, both in the Mata Mineira Region.

With those acquisitions, our portfolio went from 83MW to 125MW, a total increase in generation of over 40%.

Informe seus dados

Ao preencher os campos de identificação abaixo o arquivo será liberado para download.