2018

Start of operation & maintenance services for photovoltaic (solar) power plants, through BEI.

Acquisition of Ituerê and Costa Rica power plants, located in Costa Rica, in Mato Grosso do Sul, with a total installed capacity of 16MW.

First solar project developed by the Group is sold on Auction A-4, promoted by the Ministry of Mines and Energy.

Informe seus dados

Ao preencher os campos de identificação abaixo o arquivo será liberado para download.