2006

Acquisition of our first power plant, HGP Caquende, with only 0.9 MW of generation capacity. Installed at Macaúbas river, in the city of Bonfim, in Minas Gerais.

Currently, the power plant is no longer part of our portfolio.

Informe seus dados

Ao preencher os campos de identificação abaixo o arquivo será liberado para download.