NEC Energia Inaugurates Photovoltaic Plant
The unit is located in the city of Piumhi and has an installed capacity of
The unit is located in the city of Piumhi and has an installed capacity of
The unit is located in the city of Piumhi and has an installed capacity of 3.3MWp. The Photovoltaic Plant (UFV), fully designed, developed, and operated
The Group is entering the final stages of implementing its first solar plant. The Photovoltaic Unit (PVU) Piumhi (3.3MWp) is located in the municipality of
NEC is in the final stages of selling the Riacho solar project, which began in 2020. The photovoltaic complex will be installed in the municipality
According to data from INEP, the percentage of children struggling to read and write more than doubled from 2019 to 2022 due to the challenges
The Group’s first solar plant has entered the implementation phase, that is, the start of work for the construction and installation of structures. UFV Piumhi
Ao preencher os campos de identificação abaixo o arquivo será liberado para download.